CANADIAN CONSTRUCTION. INTEGRATED EXPERTISE.705 222 1800
Marine Construction

Fines Retention Pond

Lafarge

Fines Retention Pond
Fines Retention Pond
CLIENTLafarge
DISCIPLINEMarine Construction
COMPLETED2008
Discuss a similar project
PROJECT OVERVIEW

Fines Retention Pond

Design & Construction of a system to separate the fine particles collected from the aggregates wash system to minimize the cost of fresh water supply to the wash plant.

Vertical turbine pumps installed with maintenance platform.

  • Design
  • Sitework
  • Foundations
  • Structural
  • Mechanical/Electrical
Design & Construction of a system to separate the fine particles collected from the aggregates wash system to minimize the cost of fresh water supply to the wash plant.
01Design & Construction of a system to separate the fine particles collected from the aggregates wash system to minimize the cost of fresh water supply to the wash plant.
Vertical turbine pumps installed with maintenance platform.
02Vertical turbine pumps installed with maintenance platform.
LET’S BUILD WHAT’S NEXT

Your next project.
Our full capability.

Bring us the scope. We’ll bring the construction experience to move it forward.

Start a conversation